What is in this set
This set contains 5 editable documents. Each one follows the same Pro Site Docs structure — document control, revision history, purpose, scope, applicable legislation and guidance, responsibilities and competence requirements — so everything you issue on a job reads consistently and an auditor can follow it.
Every document is a Word file you edit. Nothing is locked, and nothing is pre-filled with a project name, so you adapt each one to the actual works, the actual site and the actual people doing it.
The documents
Environmental Management Plan
To set out the procedure for environmental management so that it is carried out consistently, safely and to the required standard across the project.
Noise & Vibration Management Plan
To set out how noise & vibration will be planned, controlled and monitored on the project.
Site Waste Management Plan
To set out how site waste will be planned, controlled and monitored on the project.
Spill Response Procedure
To set out the procedure for spill response so that it is carried out consistently, safely and to the required standard across the project.
Waste Management Procedure
To set out the procedure for waste management so that it is carried out consistently, safely and to the required standard across the project.
Legislation these documents reference
Taken from the documents themselves. Legislation is referenced for awareness and is current at the time of writing — always check the latest version on legislation.gov.uk and current HSE guidance.
- Health and Safety at Work etc. Act 1974
- Construction (Design and Management) Regulations 2015
- Management of Health and Safety at Work Regulations 1999
- Personal Protective Equipment at Work Regulations 1992
- Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013
- Provision and Use of Work Equipment Regulations 1998
- Environmental Protection Act 1990
- Control of Substances Hazardous to Health Regulations 2002
- Control of Noise at Work Regulations 2005
- Environmental Protection (Duty of Care) Regulations 1991
Get these templates
These documents are part of the Pro Site Docs library. See the full catalogue and pricing, or try 5 free templates first to see how they are written before you pay for anything.
Other template sets
- Competence, Training & Subcontractor Templates
- Underground Services & Utility Strike Prevention
- Temporary Works Templates & Checklists
- Site Inspection & Audit Templates
- Working at Height RAMS Templates
- COSHH Assessment Templates
- Pipeline & Gas RAMS Templates
- Drainage, CCTV Survey & Manhole RAMS
Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.