PSDPro Site DocsConstruction Documents
Home / Templates / Temporary Works Templates & Checklists

Temporary Works Templates & Checklists

8 editable UK templates — checklists, inspection forms and forms — ready to adapt for your site.

What is in this set

This set contains 8 editable documents. Each one follows the same Pro Site Docs structure — document control, revision history, purpose, scope, applicable legislation and guidance, responsibilities and competence requirements — so everything you issue on a job reads consistently and an auditor can follow it.

Every document is a Word file you edit. Nothing is locked, and nothing is pre-filled with a project name, so you adapt each one to the actual works, the actual site and the actual people doing it.

The documents

TW Coordinator Checklist

To provide a controlled record for tw coordinator, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

TW Supervisor Checklist

To provide a controlled record for tw supervisor, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Temporary Works Handover Form

To provide a controlled record for temporary works handover, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Temporary Works Inspection Form

To provide a controlled record for temporary works inspection, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Temporary Works Inspection Sheet

To provide a controlled record for temporary works inspection, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Temporary Works Permit

To control temporary works permit through formal authorisation, ensuring the necessary precautions and isolations are in place before work starts and the area is handed back safely.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Temporary Works Procedure

To set out the procedure for temporary works so that it is carried out consistently, safely and to the required standard across the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Temporary Works Register

To provide a controlled record for temporary works, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Legislation these documents reference

Taken from the documents themselves. Legislation is referenced for awareness and is current at the time of writing — always check the latest version on legislation.gov.uk and current HSE guidance.

Get these templates

These documents are part of the Pro Site Docs library. See the full catalogue and pricing, or try 5 free templates first to see how they are written before you pay for anything.

Other template sets

Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.