PSDPro Site DocsConstruction Documents
Home / Templates / COSHH Assessment Templates

COSHH Assessment Templates

17 editable UK templates — COSHH assessments, procedures and plans — ready to adapt for your site.

What is in this set

This set contains 17 editable documents. Each one follows the same Pro Site Docs structure — document control, revision history, purpose, scope, applicable legislation and guidance, responsibilities and competence requirements — so everything you issue on a job reads consistently and an auditor can follow it.

Every document is a Word file you edit. Nothing is locked, and nothing is pre-filled with a project name, so you adapt each one to the actual works, the actual site and the actual people doing it.

The documents

COSHH Assessment Form

To provide a controlled record for coshh assessment, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Bitumen & Hot Asphalt

To assess the risks to health from exposure to bitumen & hot asphalt and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Cement & Wet Concrete

To assess the risks to health from exposure to cement & wet concrete and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Chlorine / Disinfection Chemicals

To assess the risks to health from exposure to chlorine / disinfection chemicals and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Diesel & Fuel Oils

To assess the risks to health from exposure to diesel & fuel oils and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Epoxy & Resin Systems

To assess the risks to health from exposure to epoxy & resin systems and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Silica Dust (RCS)

To assess the risks to health from exposure to silica dust (rcs) and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Solvents, Primers & Adhesives

To assess the risks to health from exposure to solvents, primers & adhesives and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Assessment – Wood Dust

To assess the risks to health from exposure to wood dust and define the controls required under the COSHH Regulations 2002.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

COSHH Procedure

To set out the procedure for coshh so that it is carried out consistently, safely and to the required standard across the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Dust & Air Quality Management Plan

To set out how dust & air quality will be planned, controlled and monitored on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Dust & Noise Control Procedure

To set out the procedure for dust & noise control so that it is carried out consistently, safely and to the required standard across the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Dust Control RAMS

To define the safe system of work for dust control so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Lead Paint Awareness Procedure

To set out the procedure for lead paint awareness so that it is carried out consistently, safely and to the required standard across the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

On-Tool Dust Extraction Procedure

To set out the procedure for on-tool dust extraction so that it is carried out consistently, safely and to the required standard across the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Toolbox Talk – COSHH

To provide a controlled record for toolbox talk – coshh, supporting compliance, monitoring and continuous improvement on the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Toolbox Talk – Dust & Silica (RCS)

To brief operatives on dust & silica (rcs), reinforce safe behaviours and provide a record of attendance.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Legislation these documents reference

Taken from the documents themselves. Legislation is referenced for awareness and is current at the time of writing — always check the latest version on legislation.gov.uk and current HSE guidance.

Get these templates

These documents are part of the Pro Site Docs library. See the full catalogue and pricing, or try 5 free templates first to see how they are written before you pay for anything.

Other template sets

Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.