What is in this set
This set contains 10 editable documents. Each one follows the same Pro Site Docs structure — document control, revision history, purpose, scope, applicable legislation and guidance, responsibilities and competence requirements — so everything you issue on a job reads consistently and an auditor can follow it.
Every document is a Word file you edit. Nothing is locked, and nothing is pre-filled with a project name, so you adapt each one to the actual works, the actual site and the actual people doing it.
The documents
Appointed Person Checklist
To provide a controlled record for appointed person, supporting compliance, monitoring and continuous improvement on the project.
Crane Lift Plan
To set out the procedure for crane lift so that it is carried out consistently, safely and to the required standard across the project.
Generic Lift Plan
To set out the procedure for generic lift so that it is carried out consistently, safely and to the required standard across the project.
HIAB Lift Plan
To set out the procedure for hiab lift so that it is carried out consistently, safely and to the required standard across the project.
Lift Permit Template
To control lift permit through formal authorisation, ensuring the necessary precautions and isolations are in place before work starts and the area is handed back safely.
Lift Risk Assessment
To define the safe system of work for lift risk assessment so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Lift Supervisor Checklist
To provide a controlled record for lift supervisor, supporting compliance, monitoring and continuous improvement on the project.
Lifting Equipment Inspection Record
To provide a controlled record for lifting equipment inspection, supporting compliance, monitoring and continuous improvement on the project.
Slinger Signaller Briefing Form
To provide a controlled record for slinger signaller briefing, supporting compliance, monitoring and continuous improvement on the project.
Toolbox Talk – Lifting Operations
To brief operatives on lifting operations, reinforce safe behaviours and provide a record of attendance.
Legislation these documents reference
Taken from the documents themselves. Legislation is referenced for awareness and is current at the time of writing — always check the latest version on legislation.gov.uk and current HSE guidance.
- Health and Safety at Work etc. Act 1974
- Construction (Design and Management) Regulations 2015
- Management of Health and Safety at Work Regulations 1999
- Personal Protective Equipment at Work Regulations 1992
- Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013
- Lifting Operations and Lifting Equipment Regulations 1998
- Manual Handling Operations Regulations 1992
- Electricity at Work Regulations 1989
- Provision and Use of Work Equipment Regulations 1998
Get these templates
These documents are part of the Pro Site Docs library. See the full catalogue and pricing, or try 5 free templates first to see how they are written before you pay for anything.
Other template sets
- Traffic Management & Highways Templates
- Demolition, Steel Erection & Facade RAMS
- Confined Space RAMS, Permits & Rescue Plans
- Toolbox Talk Templates
- Driver & Fleet Safety Templates
- Temporary Works Templates & Checklists
- Pipeline & Gas RAMS Templates
- Environmental & Waste Templates
Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.