Launch offer — 20% off everything · code LAUNCH20 applied automatically at checkout
Instant download · Editable Word documents · CDM 2015 aligned · Secure checkout
PSDPro Site DocsConstruction Documentation
Written around CDM 2015 & UK H&S practice
Editable Microsoft Word · instant download
Faulty file? Free replacement
Secure Shopify checkout
Home / Method Statement Templates

Method Statement Templates

Ready-to-use method statement templates for every trade — the safe sequence of work, laid out professionally and fully editable. CDM 2015 aligned and delivered instantly.

Browse all 230 templates →

Method statement packs

Method Statement Library
£69View pack →
Pipeline Construction Documentation Pack
£129View pack →
Temporary Works Management Pack
£59View pack →
Steel Erection Pack
£79View pack →
Concrete & Formwork Pack
£59View pack →
Piling & Foundations Pack
£79View pack →

Frequently asked

What is a method statement?

A method statement sets out the safe, step-by-step sequence for carrying out a task, usually alongside a risk assessment (together forming a RAMS).

Are they editable?

Yes — editable Microsoft Word documents you adapt to your works.

Browse the full shop, compare plans & pricing, or start with 5 free templates.

Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.