Method Statement Library
18 professional, editable construction documents built to the Pro Site Docs framework — branded covers, document control, activity-specific content and full sign-off. Download, edit and use.
By purchasing, you agree these are digital downloads, all sales are final, and you waive the 14-day cancellation right.
Preview the documents
See the professional standard before you buy — branded cover, 5×5 risk matrix and full sign-off. Every document is fully editable Microsoft Word.
Samples are illustrative of the Pro Site Docs standard. You receive the full editable documents on purchase.
About the Method Statement Library
The Method Statement Library from Pro Site Docs is a professionally written, ready-to-use documentation set for UK contractors, site managers and health & safety teams. Written in line with CDM 2015 and current UK health and safety requirements, it gives you 18 complete, professional documents without spending hours starting from a blank page.
This pack covers the documentation this type of work demands — project and company details, scope of works, hazard identification and risk ratings, control measures, PPE requirements, emergency arrangements, inspection records and sign-off. Each document is laid out clearly and logically, so it is easy to complete, easy to understand on site, and ready to submit to clients or principal contractors before work begins.
Every document is fully editable Microsoft Word. Add your company name, logo, site address and task-specific details to make it project-specific in minutes, then reuse it across future jobs. A competent person should review and adapt each document for the specific works before use.
- Professionally written documents, ready to use
- Fully editable to suit your project
- Aligned with CDM 2015 and UK health & safety requirements
- Instant download after secure checkout
Explore our method statement templates, the full shop, or download 5 free templates first.
What's included — 18 documents
Every document is fully editable, professionally laid out (branded cover, document control, revision history, sign-off) with activity-specific content. RAMS include a 5×5 risk matrix and a landscape risk assessment table.
Who this pack is for
Contractors who write method statements regularly and want a professional, consistent starting point for the common trades and tasks.
The legislation behind it
The documents in this pack are written around the current UK requirements relevant to this work, including:
- CDM 2015 — safe systems of work
- HSE guidance on method statements
- The sector regulations named inside each document
Alongside the Health and Safety at Work etc. Act 1974, the Management of Health and Safety at Work Regulations 1999 and CDM 2015, which apply across all construction work. A competent person should confirm the exact requirements for your project.
Lee Hunt — SMSTS · NEBOSH NG1 & NG2 · NEBOSH Health & Safety Leadership Excellence · CSCS Black Card · Level 6 Diploma in Construction Site Management · IOSH · ISEP (environmental) · Temporary Works Supervisor & Coordinator · Lift Supervisor. Last reviewed: 29 August 2026.
Frequently asked
Works well with
Project-specific RAMS, document reviews and construction consultancy are delivered through LDH Construction Hub — the wider business behind Pro Site Docs.


