Launch offer — 20% off everything · code LAUNCH20 applied automatically at checkout
Guides · RAMS · Method Statements · CDM 2015
PSDPro Site DocsConstruction Documentation
Written around CDM 2015 & UK H&S practice
Editable Microsoft Word · instant download
Faulty file? Free replacement
Secure Shopify checkout
Home / Blog

The Pro Site Docs Blog

Practical guides on RAMS, method statements and CDM 2015 for UK contractors.

New · free tools
F10 checker, risk matrix, HAVS and noise calculators, manual handling weights, ladder check, RAMS checklist

Eight calculators and checkers built from HSE guidance. No sign-up. Open the tools →

F10 Notification: When You Must Notify the HSE

30 working days and 20 workers, or 500 person-days: the two tests, who files, and why notification changes less than people think.

Read the guide
HAVS Exposure Limits Explained

2.5 and 5 m/s², 100 and 400 points, and why the breaker's declared figure is a floor not a ceiling.

Read the guide
Noise at Work on Construction Sites

Why a disc cutter reaches the upper action value in four minutes, what the three thresholds actually require, and choosing hearing protection that fits the task.

Read the guide
Manual Handling Weight Limits UK

Why '25 kg' is a filter not a limit, the figures for women and two-person lifts, and the site loads that fail it every day.

Read the guide
When Can You Use a Ladder on Site?

The 'low risk, short duration' test, the six checks that decide it, and why podiums have replaced stepladders on well-run sites.

Read the guide
Hot Works Permit: What It Must Cover

The checks before the torch is lit, the named fire watcher, and the hour after the job that insurers and the Joint Code of Practice both insist on.

Read the guide
Site Welfare: What CDM Schedule 2 Requires

The six things Schedule 2 lists, why 'from day one' is the bit that catches people, and what a contractor can and cannot leave to the principal contractor.

Read the guide
Asbestos Surveys: Management vs R&D Explained

Why a management survey is not enough before you start cutting, what the refurbishment and demolition survey adds, and the duty-to-manage paperwork behind both.

Read the guide
Manual Handling Risk Assessment in Construction

The three-step duty in the 1992 Regulations, the TILE factors your assessment has to cover, and why there is no legal maximum weight.

Read the guide
Site Diary: What to Record Every Day

Not required by law, decisive in court. The daily entries that protect you on delay, weather, instructions and incidents - and the habit that keeps it credible.

Read the guide
COSHH Assessment for Silica Dust: What It Must Cover

The 0.1 mg/m3 limit, the tasks that breach it, and the controls HSE expects to see written down.

Read the guide
What Is a Permit to Dig and When Do You Need One?

The checks a permit to dig actually makes, who signs it, and the HSG47 plan-locate-dig sequence behind it.

Read the guide
Excavation Inspection Requirements Under CDM 2015

Start of every shift, after any event, after any fall of material - and what the written report has to say.

Read the guide
Lifting Plan Requirements: What LOLER Expects on Site

Planned, supervised, carried out safely - what LOLER regulation 8 means in paperwork, and the 6 and 12 month examination rules.

Read the guide
Do Sole Traders Need a Health and Safety Policy?

The five-employee rule, why main contractors ask anyway, and the three parts every policy needs.

Read the guide
Who Signs a RAMS? Author, Approver and Crew

Three signatures, three different jobs. What each one means and why the dates have to make sense.

Read the guide
What Is an ITP and When Do You Need One?

Inspection and test plans explained: hold points, witness points and who signs them off.

Read the guide
Confined Space Entry: The Documents You Need

Safe system of work, emergency arrangements and the records that have to exist before entry.

Read the guide
Subcontractor Pre-Qualification: What to Ask For

What CDM 2015 expects you to check before you appoint, and how to keep it proportionate.

Read the guide
Do You Need a Fire Risk Assessment on Site?

Which law applies on a construction site, in an occupied building, and what the assessment covers.

Read the guide
What is a Permit to Work? A UK Construction Guide

When you need a permit, the main permit types, who signs them and how the permit register works.

Read the guide
Working at Height Regulations 2005: What Contractors Must Do

The hierarchy of controls, ladder rules, inspection duties and the paperwork sites expect.

Read the guide
Scaffold Inspections: The 7-Day Rule Explained

Who can inspect a scaffold, when it's legally required and what the report must record.

Read the guide
Site Inductions: What to Include (UK Checklist)

Everything a compliant site induction covers, plus the records to keep for every operative.

Read the guide
Temporary Works Explained: BS 5975 Roles & Paperwork

What counts as temporary works, the TWC role, design checks and the register you need.

Read the guide
First Aid on Construction Sites: UK Requirements

How many first aiders you need, what the kit must include and RIDDOR reporting basics.

Read the guide
What is a RAMS Document? A UK Contractor’s Guide

A plain-English guide to RAMS for UK contractors — what it is, what goes in one, and when you need it under CDM 2015.

Read guide →
RAMS vs Method Statement: What’s the Difference?

RAMS vs method statement explained for UK contractors — how they differ, how they fit together, and which you need.

Read guide →
CDM 2015 Explained for Subcontractors

A simple guide to CDM 2015 duties for subcontractors — what the regulations require and the documents you need.

Read guide →
What Documents Do You Need to Start Work on a UK Construction Site?

The documents UK contractors need before starting on site — RAMS, inductions, permits, insurance and more.

Read guide →
How to Write a Method Statement (With Example)

Step-by-step guide to writing a clear, compliant method statement for UK construction, with a worked example.

Read guide →
Do I Need a RAMS for Domestic Building Work?

When RAMS are required on home projects and how to stay compliant.

Read guide →
RAMS for Sole Traders: What You Actually Need

What documents a sole trader needs, when, and how to produce them fast.

Read guide →
Construction Phase Plan: Who Writes It and When?

Who is responsible for the CPP under CDM 2015 and what goes in it.

Read guide →
COSHH On Site: A Practical Checklist

How to assess and control hazardous substances on a UK site.

Read guide →
Toolbox Talks: How Often and What to Cover

Frequency, topics and recording for effective toolbox talks.

Read guide →
CDM 2015 Explained: What Small Contractors Actually Need to Know

CDM 2015 explained in plain English for small contractors and sole traders — your duties, the paperwork you need, and the construction phase plan.

Read guide →
How to Write a RAMS (Risk Assessment & Method Statement): A Practical Guide

How to write a RAMS (Risk Assessment and Method Statement) that passes on site — what goes in each part and the mistakes that get RAMS rejected.

Read guide →
Method Statement vs Risk Assessment: What’s the Difference?

Method statement vs risk assessment explained — what each document does, how they differ, and why UK sites usually need both as a RAMS.

Read guide →
What Is a COSHH Assessment and How Do You Do One?

What a COSHH assessment is, when you need one, and how to carry one out — including the silica dust risk that gets overlooked on UK sites.

Read guide →

General guidance only. This article explains how the rules generally work in UK construction. It is not advice for your specific site, task or project, and it is not legal advice. Your own risk assessment, method statement and arrangements must be prepared and checked by a competent person for the actual work being done.