PSDPro Site DocsConstruction Documents
Home / Templates / Water Mains & Pipe Works RAMS

Water Mains & Pipe Works RAMS

7 editable UK templates — RAMS and procedures — ready to adapt for your site.

What is in this set

This set contains 7 editable documents. Each one follows the same Pro Site Docs structure — document control, revision history, purpose, scope, applicable legislation and guidance, responsibilities and competence requirements — so everything you issue on a job reads consistently and an auditor can follow it.

Every document is a Word file you edit. Nothing is locked, and nothing is pre-filled with a project name, so you adapt each one to the actual works, the actual site and the actual people doing it.

The documents

Clean Water Mains RAMS

To define the safe system of work for clean water mains so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Pipe Cutting RAMS

To define the safe system of work for pipe cutting so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Pressure Test Certificate

To formally record and certify pressure test against the relevant requirements.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Pressure Testing RAMS

To define the safe system of work for pressure testing so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Sleeve Installation RAMS

To define the safe system of work for sleeve installation so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Water Hygiene Procedure

To set out the procedure for water hygiene so that it is carried out consistently, safely and to the required standard across the project.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Water Main Pressure Test RAMS

To define the safe system of work for water main pressure test so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.

Health and Safety at Work etc. Act 1974Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Personal Protective Equipment at Work Regulations 1992

Legislation these documents reference

Taken from the documents themselves. Legislation is referenced for awareness and is current at the time of writing — always check the latest version on legislation.gov.uk and current HSE guidance.

Get these templates

These documents are part of the Pro Site Docs library. See the full catalogue and pricing, or try 5 free templates first to see how they are written before you pay for anything.

Other template sets

Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.