What is in this set
This set contains 15 editable documents. Each one follows the same Pro Site Docs structure — document control, revision history, purpose, scope, applicable legislation and guidance, responsibilities and competence requirements — so everything you issue on a job reads consistently and an auditor can follow it.
Every document is a Word file you edit. Nothing is locked, and nothing is pre-filled with a project name, so you adapt each one to the actual works, the actual site and the actual people doing it.
The documents
Daily Traffic Management Inspection Form
To provide a controlled record for daily traffic management inspection, supporting compliance, monitoring and continuous improvement on the project.
Highway Construction RAMS
To define the safe system of work for highway construction so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Lineside Working Procedure
To set out the procedure for lineside working so that it is carried out consistently, safely and to the required standard across the project.
Modern Slavery & Human Trafficking Statement
To set out the company’s policy, commitments and arrangements for modern slavery & human trafficking statement, and to communicate them to all employees, sub-contractors and interested parties.
Pedestrian Management Procedure
To set out the procedure for pedestrian management so that it is carried out consistently, safely and to the required standard across the project.
Rail Safe System of Work RAMS
To define the safe system of work for rail safe system of work so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Reinstatement RAMS
To define the safe system of work for reinstatement so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Road Closure Checklist
To provide a controlled record for road closure, supporting compliance, monitoring and continuous improvement on the project.
Road Marking RAMS
To define the safe system of work for road marking so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Surfacing & Paving RAMS
To define the safe system of work for surfacing & paving so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Temporary Traffic Control Checklist
To provide a controlled record for temporary traffic control, supporting compliance, monitoring and continuous improvement on the project.
Traffic Management Briefing Record
To provide a controlled record for traffic management briefing, supporting compliance, monitoring and continuous improvement on the project.
Traffic Management Plan Template
To set out the procedure for traffic management so that it is carried out consistently, safely and to the required standard across the project.
Traffic Management Procedure
To set out the procedure for traffic management so that it is carried out consistently, safely and to the required standard across the project.
Traffic Management RAMS
To define the safe system of work for traffic management so that the works are carried out without risk to the health and safety of operatives, other workers or the public, and in compliance with the relevant legislation.
Legislation these documents reference
Taken from the documents themselves. Legislation is referenced for awareness and is current at the time of writing — always check the latest version on legislation.gov.uk and current HSE guidance.
- Health and Safety at Work etc. Act 1974
- Construction (Design and Management) Regulations 2015
- Management of Health and Safety at Work Regulations 1999
- Personal Protective Equipment at Work Regulations 1992
- Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013
- New Roads and Street Works Act 1991
- Lifting Operations and Lifting Equipment Regulations 1998
- Provision and Use of Work Equipment Regulations 1998
- Control of Substances Hazardous to Health Regulations 2002
- Electricity at Work Regulations 1989
Get these templates
These documents are part of the Pro Site Docs library. See the full catalogue and pricing, or try 5 free templates first to see how they are written before you pay for anything.
Other template sets
- COSHH Assessment Templates
- Accident & Incident Reporting Templates
- Permit to Work Templates
- Pipeline & Gas RAMS Templates
- Concrete, Formwork & Reinforcement RAMS
- CDM 2015 Document Templates
- Asbestos RAMS Templates
- Electrical RAMS & Safe Isolation Templates
Templates, not certificates. Every Pro Site Docs document is an editable template written in line with CDM 2015 and current UK health & safety requirements. It is not automatically compliant on its own: a competent person must review and adapt each document for the specific works, site and conditions before it is used or submitted.